【钢结构·桥梁】小巧精致的人行桥

本文转载公众号DS结构工作室

Bike Ramp Footbridge Parkbrug

公园桥之自行车坡道

ARCHITECT:Ney & Partners

Antwerp, Belgium/比利时安特卫普

■Study/研究2017-2018年

■Execution/ 实施2018-2021年

■Budget€2023412/ 预算 202.3万欧元

■ Length140m/ 长度 140m

■ Area510m2/ 面积510m2

实景照片

The new bike and pedestrian Park bridge, designed by Ney & Partners, has known intense usage since its opening. On the eastern side of the Spoor Noord park, a ramp gives a comfortable access for cyclists from the park to the bridge. On the western side cyclists currently use a staircase with a bicycle conveyor belt or a lift. Ney & Partners is now designing a bike-friendly and safe solution to access the western side.

Ney&Partners设计的新的自行车和人行公园桥(斯普努德公园桥)自启用以来,使用率一直很高。在东侧,人行桥有一条方便骑行人的坡道连接斯普努德公园。在西侧,骑自行车的人使用带有自行车传送带楼梯或电梯来上下桥梁。目前Ney&Partners正在设计进入西侧区域的自行车友好、安全的解决方案。

西侧既有上下桥方案

西侧新增上下桥方案

A new loop-shaped lightweight steel structure will be built above an underground car park. Production of the 140m-long steel ramp will get under way in the workshops of steel constructor Emergo in autumn 2019. The ramp is expected to be completed in 2020.

公园桥西侧地下停车场上方将新建一座环形的轻型钢结构坡道。2019年秋季,长140m的钢坡道制造在钢结构承包商Emergo工厂内进行,预计2020年完工。

钢坡道加工制造
钢坡道吊装运输

Critical constraints for the design of the newramp have included guaranteeing a slope of maximum 4%, keeping an 8m distance to the adjacent facades, finding the widest possible radii and securing a logical connection between the bridge and the square. Steel was chosen for the main structure in order to reduce the weight on the existing underground structure and meet construction constraints.

新增坡道设计的主要限制因素包括最大坡度限制为4%,与相邻墙面保持8米距离,寻求尽可能大的半径,确保桥梁与广场间合理连接。为减轻作用于既有地下结构上的重量以及满足施工限制条件,坡道主体结构选择钢结构。

钢坡道立柱安装与支架搭设

钢坡道安装
In cross section, the adjacent parts of the deck are connected by V-shaped columns. The columns stand on top of the existing columns in the underground car park. The deck is a closed triangular box girder, capable of withstanding torsion. For the handrail, a transparent solution with slim posts and a handrail in stainless steel was chosen. LED lighting is integrated into the handrail. The bottom of the steel structure will also be illuminated, allowing indirect lighting of the square.
在横断面设计上,相邻部分桥面通过位于地下停车场现有立柱顶部的V形柱连接。桥面采用了能够承受扭转的闭口三角形箱梁。桥面两侧栏杆选择通透的不锈钢材质细柱和扶手方案,并在扶手内集成LED灯源。钢结构底部亮化允许使用广场上的间接照明
扶手集成LED光源亮化效果


转自:钢结构-公众号

本文来自网络,不代表钢构人的立场,转载请注明出处。搜索工程类文章,就用钢构人网站。 https://www.ganggouren.com/2021/08/1585b15a5f/

钢结构地图

上一篇
下一篇

作者: ganggouren

为您推荐

发表回复

您的电子邮箱地址不会被公开。 必填项已用 * 标注

联系我们

联系我们

17717621528

在线咨询: QQ交谈

邮箱: 1356745727@qq.com

工作时间:周一至周五,9:00-17:30,节假日休息
关注微信
微信扫一扫关注我们

微信扫一扫关注我们

关注微博
返回顶部