Chapter 10

Regulations

第十章 规定


10.1 List of Regulators



1 Building Construction Authority (BCA)建筑事务监督


Code of Practice on Buildability 2017

CP82, BCA’s Good Industry Practice Guide

Technical Requirements for Storey Shelters 2015

Technical Requirements for Household Shelters 2012


2 Land Transport Authority (LTA)陆路运输管理局


Rule 99 of Road Traffic Rules (OVM)

Rule 2010 Promulgated under the Road Traffic Act (OVM)


3 Singapore Civil Defence Force (SCDF)新加坡民防部队(SCDF)


Fire Safety Act and Regulation ”Code of Practice for Fire Safety Precaution in Buildings”

消防安全法和条例《建筑物防火安全措施实务守则》

Fire Safety Requirements for the use of Plastic in Building Construction, SCDF’s circular dated 1 Oct 2014.

《建筑施工中使用塑料的消防安全要求》,SCDF于2014年10月1日发出的通知。

Permitting Services within Fire-Rated Dry Construction in Buildings, SCDF’s circular dated 13 Nov 2014.

允许在建筑物的防火干燥建筑内提供服务,SCDF于2014年11月13日发出的通知。


4 National Environment Agency (NEA)国家环境局(NEA)


Code of Practice on Environmental Health, Singapore Standard SS593, COP on Pollution Control, Code of Practice on Sewerage and Sanitary Works, Environmental Protection and Management Act, and their Regulations, including the Environmental Protection and Management (Control of Noise at Construction Site) Regulation

《环境卫生工作守则》、《新加坡标准SS593》、《污染控制COP》、《污水和卫生工程工作守则》、《环境保护和管理法》及其条例,包括《环境保护和管理(建筑工地噪音控制)条例》


5 Public Utilities Board (PUB)公用事业委员会(PUB)


Singapore Standard CP 48: Code of Practice for Water Services

  • 1. Sewerage and Drainage Act

  • 2. Sewerage and Drainage (Sanitary Works) Regulations

  • 3. Code of Practice on Sewerage and Sanitary Works

  • 4. Code of Practice on Surface Water Drainage

  • 5. Public Utilities (Water Supply) Regulations


BS EN 1253-1, in event, if client preferences for shallow floor trap (SFT) all relevant test shall comply with BS EN 1253-1 as follows:

  • 1. Anti-Blockage Test

  • 2. Water Tightness Test

  • 3. Flow Rate Test

  • 4. Resistance to water seal to pressure

  • 5. Odour Tightness Test

  • 6. Depth of water seal

  • 7. Access for Cleaning

  • 8. Side Inlet


6 Ministry of Manpower (MOM)人力资源部


Workplace Safety And Health Act 2014

WSH (Exemption) Order 2011

Workplace Safety and Health (Design for Safety) Regulation 2015


10.2 Minimum Level of Off-Site Works for PPVC最低预制率



10.3 Building Innovation Panel (BIP) and PPVC Manufacturer Accreditation Scheme (MAS) “建筑创新小组”及“PPVC制造商认可计划”


本文来自网络,不代表钢构人的立场,转载请注明出处。搜索工程类文章,就用钢构人网站。 https://www.ganggouren.com/2020/06/9955701bac/

钢结构地图

上一篇
下一篇

作者: ganggouren

为您推荐

发表回复

您的电子邮箱地址不会被公开。 必填项已用 * 标注

联系我们

联系我们

17717621528

在线咨询: QQ交谈

邮箱: 1356745727@qq.com

工作时间:周一至周五,9:00-17:30,节假日休息
关注微信
微信扫一扫关注我们

微信扫一扫关注我们

关注微博
返回顶部