轻钢笔记《新加坡强制使用整体卫浴/PBU》

思考一

建筑工业化不是铝模,也不是PC,也不是钢结构。

而是一种综合应用,综合解决方案。

一定是要有顶层设计的!!

思考二

为什么新加坡强制使用的整体卫浴是PC和轻钢两种形式的?

在开发产品的时候有没有想过自己开发的产品是不是有前途和被其它国家普遍认可的?

日本的东西就是好东西吗?

思考三

轻钢和PC是全世界普遍认可的结构体系,

在轻钢设备白菜价的今天,轻钢行业的突围方向是应用,是深加工能力!


视频一


视频二


视频三 tong hai yang公司的产品展示

    

补充资料(以下图文复制于新加坡BCA官方网站)


PBU Performance Requirement

整体卫浴执行要求

What is a Prefabricated Bathroom Unit (PBU)?

什么是整体卫浴

A prefabricated bathroom unit refers to a bathroom unit preassembled off-site complete with finishes, sanitary wares, concealed pipes, conduits, ceiling, bathroom cabinets, shower screen and fittings before installing in position.


What are the benefits of using PBUs?

整体卫浴的优点

By shifting most of the fabrication work and wet trades off-site to the controlled environment of a factory, PBUs can yield both time and manpower savings by about 60%. Downtime can be minimised as production of PBUs can continue even during times of inclement weather. Furthermore, there is a better control of both materials and the prefabrication process, resulting in higher quality finishes and lesser wastage.


Mandated Use of Prefabricated Bathroom Unit (PBU)

关于强制使用预制整体卫浴的规定


The use of prefabricated bathroom unit (PBU) is mandatory for all non-landed residential Government Land Sale (GLS) sites from 1 Nov 2014 onwards. Further details on the mandatory requirement are stipulated in the Code of Practice on Buildability 2014. You may find out more information about this mandatory requirement through the following circular issued on 1 Nov 2014.
执行日期是2014年12月1号,项目是关于国有出售土地的公寓。





Fig 2 Metal Frame PBU with Drywall Panels




Prefabricated Bathroom Unit (PBU) Acceptance Framework

可以接受的整体卫浴的架构(非常重要,指明了我们应该研究的方向)

PBU designs have evolved over the years and may also involve the use of alternative materials in its fabrication. To ensure that the different PBU systems being used at the mandated development sites are reliable and durable, BCA has set up an acceptance framework consisting of building regulatory agencies as well as industry experts to ensure that the design and materials used are robust and can meet the minimum standards set.

Under the PBU acceptance framework, PBU suppliers and manufacturers who intend to supply their PBU systems to be used at development sites where PBU is mandated must first ensure that their PBU system can meet the PBU performance requirement. The proposed PBU systems will also be subjected to the evaluation and acceptance of the Building Innovation Panel (BIP).

There are two separate evaluation stages under the BIP for PBU systems. Stage 1 consists of a PBU Screening Panel chaired by BCA and other industry representatives, who will evaluate the design and materials used. Once the PBU system is accepted by the PBU Screening Panel, the BIP Secretariat will then assist and coordinate submissions to the remaining regulatory agencies under the BIP and facilitate early resolution of outstanding issues between the applicant and the respective agencies (Stage 2).

A letter of In Principle Acceptance (IPA) will be granted if acceptances are obtained from both the PBU Screening Panel (Stage 1) and the relevant participating regulatory agencies (Stage 2) under the BIP. The accepted PBU systems are listed below (refer to Table 1).

PBU Manufacturer Accreditation Scheme (PBU MAS)
合格供应商管理
The manufacturer of the PBU system will need to apply for the accreditation under the PBU Manufacturer Accreditation Scheme (PBU MAS) after obtaining IPA from BIP. PBU manufacturers will be accredited at the firm level. However, if the manufacturer is using an existing construction site as a temporary production facility to carry out finishing and fitting works for the PBU, such a temporary production facility will also require accreditation. Moreover, when the temporary production facility is moved to a different site, the manufacturer is required to re-apply for the accreditation again. Manufacturers who have obtained the IPA (from BIP) and are accredited (by the PBU MAS) shall be responsible for the quality and productivity of the PBU production. In addition, they shall also be ready to provide advice to homeowners with regards to the maintenance of the PBU.

PBU suppliers/manufacturers who have successfully obtained the IPA are reminded to apply for the PBU MAS as soon as possible due to the lead time required. The accreditation process under the PBU MAS may take up to 6 months if the production facilities do not meet the relevant requirements under the accreditation scheme.
For projects where the adoption of PBUs is mandatory, PBU suppliers are reminded to apply for and clear at least Part 1: Documentation Audit of the PBU MAS before commencing production works at the factory.

Fig 3: Acceptance Framework Flowchart


Application Procedure

申请程序

Please send in your application with the following documents:
A completed and duly signed application form
Completed checklist, Appendix A and B
Presentation slides on the proposed PBU system (you may refer to the sample template for the recommended presentation flow and content)
Additional supporting documents (e.g. material or product specification, quality certifications or test reports by accredited laboratories etc)
A set of drawings of your proposed PBU system as per the requirements in the Table Reference and suggested template
Test reports for boards used as wall and floor of PBUs (please refer to Appendix C for the list of test methods required)
Test reports for lightweight concrete panels used as wall and floor of PBUs (please refer to Appendix D for the list of test methods required)


Any other relevant information

For item (b), please ensure that the presentation slides cover all the necessary content as per the checklist in item (a). The presentation content should also show that the proposed PBU system can meet all the PBU performance requirement. Please note that the applicant can only go for presentation to the PBU screening panel upon completion of item (a), (b) and (d). 

In-Built Bathrooms for Prefabricated Prefinished Volumetric Construction (PPVC)

Suppliers who intend to manufacture and supply PPVC modules should take note that the in-built bathroom within the PPVC module must comply with the PBU Performance Requirement as well. The accepted in-built bathroom systems are listed in Table 2 below.
List of PBU suppliers that meet the Performance Requirement
The list of PBU systems which meet the performance requirement and their respective supplier and/or manufacturer can be found here. 
The list of In Principle Acceptances (IPA) granted are listed below. Please take note that some suppliers IPAs are still pending and thus will not be listed in the table below.
Table 1 Accepted PBU Systems
表格略


Suspension Notice

The In Principle Acceptance (IPA) of the following PBU supplier is suspended for non-compliance with the performance requirements and acceptance framework under the Code of Practice on Buildability. With immediate effect, the PBUs provided by the supplier cannot be implemented at any new building development until further notice.


List of drywall systems allowed for use in PBU systems

A drywall system generally comprises panel board(s) fixed on each side of the framing system e.g. studs, tracks and joint materials, infill with insulation.

There are different types of drywall systems available in the market that offer a wide range of impact strength, fire resistance, acoustic ratings, and moisture resistance to meet design requirements. It is critical to ensure that the drywall system and/or panel board(s) used for the floors and walls of bathrooms are durable in wet areas in order to safeguard the interests of homeowners.

Under the Building Innovation Panel of the PBU Acceptance Framework, the type of drywall system including its brand/model and thickness of board used in the PBU system or in-built bathroom is required to meet the following criteria:
The drywall system shall achieve a minimum grade of Medium Duty in the test methods in accordance with the SS492.

The respective panel board used shall comply fully with the passing criteria of the prevailing test standards as listed on Appendix C: Test Reports for Panel Boards Used as Wall and Floor of PBUs.

Till date, the following panel boards as listed in Table 4 have been tested to the 13 standards listed in Appendix C. Please refer to their respective test report for SS492 to find out the acceptable framing system for each drywall system.

The Qualified Person (QP) shall take all reasonable steps and exercise due diligence to ensure that the drywall system and/or any panel board(s) used in the PBUs or in-built bathrooms installed in the project meet the following minimum requirements:
The details of the drywall system shall be in accordance with those accepted by the Building Innovation Panel (BIP) and granted with the In-Principle Acceptance (IPA) for each respective PBU supplier.
The drywall system and the respective panel board used shall comply fully with the passing criteria of the prevailing test standards as listed on Appendix C: Test Reports for Panel Boards Used as Wall and Floor of PBUs.

The PBUs installed in the project shall comprise panel boards with the same brand name and thickness as specified in the In Principle Acceptance (IPA) letter and/or drawings of each respective PBU supplier. Both IPA letter and drawings can be found in Table 1 and 3 of the BCA website.

Any materials used for the finishes (such as waterproofing system, tile adhesive, tiles, etc.) of the PBU wall are compatible with the drywall system.

Where the materials, dimensions and configuration of the framing system or part thereof of the drywall system are different from those as tested for the acceptable test reports as listed in Table 4, the QP shall ensure that either of the following is satisfied:
The drywall system is tested in accordance with SS492 and achieves a minimum grade of Medium Duty; or
A Professional Engineer (PE) registered under the Professional Engineers Board, Singapore, provides calculations and endorsement to show that the different framing system of the drywall system is equivalent or better in terms of structural performance as compared to the tested system
A PE designs and endorses the necessary supports and reinforcement to the drywall system for the installation of fixtures and future provision of grab bars in compliance with the Code of Barrier-Free Accessibility in Buildings.

All metal components in the drywall system shall be of suitable materials resistant to and suitably protected against corrosion over a long period of time, such as hot-dipped galvanised steel and zinc/aluminium alloy-coated steel.

Precautions to prevent electrolytic corrosion are taken where dissimilar metals of the drywall systems are in contact.

None of the panel board’s part, mixture, chemical constituents, brands/model, and /or plant location shall be changed.

The above listing is based on the submissions made to the Building Innovation Panel by PBU suppliers. BCA shall not entertain suppliers of drywall system and/or panel boards on requests to list products outside the submissions to the Building Innovation Panel.

NOTE: The above publishing of panel boards is solely for the purpose of sharing of information to facilitate the industry users to source for such products. It is NOT an endorsement of these products by BCA nor does BCA give any warranties, explicit or implied, regarding the availability of the products, information, product or services, efficacy of the products or warranties of merchantability, fitness for a particular purpose, title or non-infringement. 
The supplier/user must ensure that their products are safe for public use and comply with all relevant regulations and statutory requirements at all times.


本文来自网络,不代表钢构人的立场,转载请注明出处。搜索工程类文章,就用钢构人网站。 https://www.ganggouren.com/2020/06/85f4ea7525/

钢结构地图

上一篇
下一篇

作者: ganggouren

为您推荐

发表回复

您的电子邮箱地址不会被公开。 必填项已用 * 标注

联系我们

联系我们

17717621528

在线咨询: QQ交谈

邮箱: 1356745727@qq.com

工作时间:周一至周五,9:00-17:30,节假日休息
关注微信
微信扫一扫关注我们

微信扫一扫关注我们

关注微博
返回顶部